While Bob built track panels, John O and Stephen drilled and labelled the sill boards for each footer and Stephen delivered the footers to the trestle right of way. Ken, James, and “Dead Eye” Rob positioned each footer. 33 footers were needed to reach the bridges around the lake.
Trestle Construction Begins
by