Cut and fill complete

At long last, the cut and fill has been completed. Here is a walk from the end of the fill up the 1% grade through the cut and then to Coleto.

In case you are wondering, the deepest part of the cut has been done for over a year and the walls have not collapsed. But, a retaining wall is planned.


Posted

in

by